450 MW – WPP Botievo and other

450 MW – WPP Botievo and other

Ort Ukraine
Zeitraum 2010-2011
  • Infrastructure planning
  • Geotechnical engineering
  • Pile foundation design
  • Electrical engineering
  • EPC-Management
  • Site supervision
  • Design author acc. PCL
  • Construction inspector acc. PCL